
eZ-NDT 938691 Inspection Mode Testing 3-3
Reviewing NDT Inspection Results
Shows a picture of the part
Resets the counts to zero
Displays name of company and part number.
The 2 fields are edited from the Acquisition Tab
under Edit / Configuration.
Automatically increments the serial number.
Pass: Displays the quantity of parts that passed.
Fail: Displays the quantity of parts that failed.
Curr: Displays the number of parts that have
consecutively passed or failed since the end of
the previous sequence. For example: If we had
56 parts in a row pass, Curr would display “56
Pass,” If the next part failed Curr would display
“1 fail.” If the very next part failed Curr would
display “2 fail” etc.
The Project Panel contains the NDT inspection results since the last time the <Reset Summary Counts>
button (3) was pressed. The total number of Passed and Failed parts, as well as the consecutive count, are
listed (8).
The Since label displays the date and time that the <Reset Summary Counts> button (3) was last clicked.
The <Reset Summary Counts> button clears the entries for Passed, Failed, Current (Consecutive Count),
and resets the date and time [under the Since label]. Clicking the button does not erase the data stored in
the history file.
Note that the date and time of the last NDT inspection is displayed in the upper left corner of the panel.
Commenti su questo manuale